You want an EV charger in the underground car park, a heat pump against the façade, an air-conditioning unit with an outdoor module or solar panels on the roof. Must you request this from the general assembly — and risk being blocked by a majority? Or is a registered letter to the managing agent enough? Since the energy crisis this has been the central controversy in Belgian apartment buildings, and the notification procedure of Article 3.82 of the New Civil Code (NCC) sits right at the heart of it.
The short answer: the notification procedure is a genuine legal right, but its scope is narrower than many co-owners think — and those who misjudge its limits end up with an installation that must be dismantled. This article sets out the framework, together with the recent case law on EV chargers, heat pumps, air-conditioning units and terrace canopies.
The notification procedure of Article 3.82 NCC
Article 3.82 NCC grants every co-owner a statutory right to install cables, pipes and associated facilities in or on the common parts, for the benefit of their private unit — think of infrastructure for energy (a supply cable to an EV charger), water or telecommunications. The procedure is deliberately low-threshold: no prior consent from the general assembly, but a notification.
In practice it works as follows. The co-owner sends, at least two months before the works start, a registered letter to the managing agent (and to the other co-owners or the association of co-owners (ACO), depending on the configuration) with a description of the planned works and a justification of the optimal route. Within that two-month period, the ACO or the other owners may object — but not casually: the objection must be based on a legitimate interest, as the law defines it: the existing infrastructure already suffices, the works cause substantial damage to the common parts, or there is a serious safety or aesthetic concern.
If no objection is raised, the owner may carry out the works — at their own expense, and with the obligation to restore the common parts to their original condition where the works require it.
The critical boundary: notification does not cover physical works on the common parts
This is where things often go wrong in practice. The notification procedure covers the laying of cables and pipes — nothing more. As soon as the installation requires physical works on the common parts going beyond the route itself, the file reverts to the ordinary consent rules: a two-thirds majority for works to the common parts (Art. 3.88 § 1, 1° NCC), and where applicable even a four-fifths majority or a real right in rem.
The heat pump is the textbook example. The supply cable to the pump: notification. But the outdoor unit itself, anchored to a common façade, with drilled openings through that façade for the pipes: those are physical works on a common part, for which the two-thirds majority applies. The Justice of the Peace of Ostend II confirmed this expressly on 25 May 2022: alongside the ACO's policy choice for a collective heating approach, a two-thirds consent was also required because physical works on the common parts would take place.
The same logic applies to solar panels. The connection cable: notification. But panels placed on the common roof raise questions that go well beyond the notification procedure: who gets which part of the roof when the roof is too small for everyone, what happens with the generated electricity, and is a right of superficies (opstal) not required — an act of disposal for which a 4/5 majority applies (see the article on acts of disposal and the 4/5 majority)? Notification is then at most the starting point of a file, never its conclusion.
Rule of thumb: the notification procedure gives you a passage, not a place of establishment. Cables and pipes may pass through; anything permanently fixed on or to the common parts requires consent.
The case law: three outcomes, three lessons
Brasschaat, 7 February 2022 — the air conditioner refused. An owner installed an air-conditioning system with an outdoor unit. The ACO's objection, based on noise nuisance for the surrounding units, was upheld. Lesson: noise and visual impact are legitimate grounds. Anyone planning an outdoor unit is better off anticipating with a noise study and a well-considered choice of location than hoping no one will complain.
Ostend II, 25 May 2022 — the heat pump refused. The ACO preferred a collective heating solution over individual installations and refused on that basis. The judge followed suit: a policy-based, objective reasoning survives scrutiny. Lesson: a well-motivated ACO has a strong position — and an owner wishing to go against a collective vision must bring more than personal preference to the table.
Wavre, 6 August 2021 — the refusal annulled. An owner had supported their request for a heat pump with the high electricity prices and a calculation of the advantage. The general assembly refused outright. The Justice of the Peace annulled that refusal as unlawful: a bare refusal is not sufficient in the face of a quantified personal disadvantage. Lesson: the file wins. Those who put figures on the table force the ACO to give reasons — and an ACO that fails to give reasons loses. For the full framework of the unlawful decision, see the article on irregular versus unlawful ACO decisions.
Permanent constructions: the roof terrace of Hasselt
One step further than installations lie permanent constructions — and here the case law is strict. On 24 October 2023 the Justice of the Peace of Hasselt I dealt with the file of an owner with an exclusive right of use over a roof terrace, who had installed there a veranda-like terrace canopy of some 19 m²: supporting posts, glass sliding walls, glued to the roof.
The judge did not go along with the factual trajectory that had led to the installation, but ruled on principle. A fixed construction of this kind significantly alters the external appearance of the building and must be dismantled when the roof is renovated — after all, the roof remains common. More importantly: such a construction de facto privatises a common part. That can never happen without the general assembly's consent, exclusive right of use or not. The order: dismantle and demolish.
The exclusive right of use permits the use for which it was granted — tables, chairs, a parasol on the terrace — but does not grant any right to build. Anyone who crosses the line between using and building is building on quicksand. For the nature and limits of that right of use, see the article on the exclusive right of use over common parts.
When it has already been done: regularisation and the de facto majority
What if the installation is already in place, without notification and without consent? Then there are two scenarios.
The first: the owner requests regularisation from the general assembly. That is the royal road — though it offers no guarantee, since the general assembly may refuse as long as its refusal is not unlawful.
The second scenario is more subtle and emerged in a case before the Justice of the Peace of Hasselt I of 18 April 2023. Co-owners troubled by an unlawfully installed ventilation system against the side façade had the general assembly vote on its removal. Result: 68% voted against removal. The judge read this as a de facto two-thirds majority in favour of retention — precisely the majority required for such an installation on the common parts. The person who had installed it, and who had never requested regularisation, got off lightly: those who voted against had, through their own agenda item, legitimised the installation.
The strategic lesson cuts both ways. Anyone seeking removal should formulate their agenda item carefully — a rejected removal request may be read as a granted consent. And anyone who has installed without consent is not by definition lost — but is best advised not to build their position on the chance of someone else's agenda-setting.
Who assesses the notification? Not the managing agent alone
A final procedural point with major practical impact. When a notification comes in, the question arises who assesses whether the procedure applies and whether an objection will be raised. The temptation is for the managing agent to handle this alone — but the managing agent who arbitrates on their own initiative takes on a responsibility that can rebound as soon as the discussion escalates.
Two workable models. Either the managing agent puts the item to the general assembly — clean, but slow, certainly if a special general assembly is needed within the two-month deadline. Or — and this is the practical recommendation — the ACO provides in an internal rules of procedure of the council of co-ownership that the council, together with the managing agent, takes a position on the application of the notification procedure, with a mandate to reply on behalf of the ACO. That way what needs to be done procedurally has been done, the managing agent does not bear the responsibility alone, and in the event of an objection the applicant has a formal document with which to enforce their rights before the Justice of the Peace.
One thing an assembly must not do: improvise the matter at the meeting itself. In a case where an owner asked at the assembly whether they could install a socket for their electric vehicle, the item was abruptly put on the agenda and voted down — and that vote was annulled, because no binding vote can be taken on an item that was not validly placed on the agenda.
Step-by-step plan for the owner
Step 1 — Qualify your works. Only cables and pipes (EV charger supply, data cable)? Then the notification procedure suffices. Outdoor unit, drilling, anchoring, panels on the roof? Then you (also) need general assembly consent with the appropriate majority.
Step 2 — Notify correctly. By registered post, at least two months in advance, with a description of the works and justification of the route. A defective notification is no notification.
Step 3 — Quantify your interest. If it comes to a general assembly vote or an objection, the file wins: energy prices, payback period, noise study, visualisation. The Wavre case law shows that a quantified personal disadvantage renders a bare refusal unlawful.
Step 4 — In case of refusal: four months. A refusal by the general assembly can be challenged before the Justice of the Peace within the four-month limitation period (Art. 3.92 § 3 NCC). There is no specific appeal procedure against an objection within the notification procedure — there too, the route to the Justice of the Peace is the appropriate way.
And for the ACO the mirror image applies: motivate every refusal objectively, anchor it in policy (collective approach, aesthetics, safety), and never improvise at the meeting itself. The complete framework of majorities and decision-making can be found in the pillar on the ACO in practice.
Are you planning works in your apartment building, or are you as an ACO dealing with a request you cannot resolve? Contact us at info@reius.be or via the contact form for a first evaluation of your file.
In re. In jure — Thorough in the facts. Considered in the law.